How much does a concrete base cost in the UK?
A concrete base costs £1,200 on average in the UK. Most jobs fall between £500 and £4,500 for the base. Size of base: Small shed or greenhouse base £500 to £900; Medium base £1,000 to £1,500; Garden room or single garage base £1,500 to £2,600. Prices reviewed November 2026.
Concrete base cost calculator
Use the calculator to price your concrete base in 2026. Choose the option that fits and pick your region for a UK cost range. Nothing is sent anywhere.
A concrete base for a shed, greenhouse, garden room or garage is priced mainly by its size. A firm digs out the ground, lays and compacts a hardcore sub-base, sets up timber formwork and pours the concrete. Small bases cost the most per square metre, because the visit, the set-up and the waste are much the same whatever the size, and what is included varies from firm to firm.
Prices are for a firm to dig out, lay a sub-base, set formwork and pour the concrete on a straightforward site. Steel mesh and a damp-proof membrane are extra at some firms, and poor access or a sloping site adds to the price.
Need to know how much material to order? Try the concrete calculator.
Concrete base cost breakdown
Typical concrete base costs, by option:
| Size of base | Typical UK cost |
|---|---|
| Small shed or greenhouse base, up to 8x6 ft (about 4.5 m²) | £500 to £900 |
| Medium base, 8x10 to 12x10 ft (7 to 12 m²) | £1,000 to £1,500 |
| Garden room or single garage base, 14 to 20 m² | £1,500 to £2,600 |
| Double garage or large slab, 25 to 40 m² | £2,500 to £4,500 |
What's included in the price?
Typical concrete base prices include:
- Clearing and digging out the ground to the right depth
- A compacted hardcore sub-base
- Timber formwork set level
- The concrete, poured and finished
- Taking away the soil that was dug out, on most firms' prices
What changes the price?
The things that move concrete base prices most:
The size of the base
How thick the concrete is, and whether it has steel mesh
Whether a damp-proof membrane is included
How much digging the ground needs, and whether it slopes
Access: whether a lorry can pour straight in or the concrete has to be barrowed or pumped
How the price is built up
Firms quote one price for the whole base: digging out, the hardcore sub-base, formwork, the concrete and the labour, and on most prices taking the soil away. Size sets most of the price, but not in proportion. The visit, the set-up and the waste are much the same for a small base as a large one, so at one firm an 8 by 6 ft base works out at about £170 per square metre and a 16 by 10 ft base at about £105. Thicker concrete, steel mesh, a membrane, a sloping site or concrete that has to be barrowed or pumped in add to it.
Ways to keep the cost down
- Ask whether the price includes digging out, a sub-base and taking the soil away, as some firms leave that to you
- Compare the thickness of concrete and whether mesh and a membrane are included
- Clear the area before the firm arrives, as some charge a return visit if the site is not ready
- For a small shed, price a paving slab or timber base as well
- If an old base has to come out first, get that priced in the same quote
Does where you live change the cost?
In London, a concrete base typically costs around £1,400, about 20% above the UK average of £1,200. In the North, Scotland and Wales the guide figure is nearer £1,200.
| Region | From | Typical | Up to |
|---|---|---|---|
| Midlands / East (UK average) | £500 | £1,200 | £4,500 |
| London | £600 | £1,400 | £5,400 |
| South East / South West | £530 | £1,300 | £4,700 |
| North / Scotland / Wales | £490 | £1,200 | £4,400 |
Guide prices for the base, scaled with the same regional multipliers as the calculator. Not quotes.
Concrete base cost in major UK cities
| City | From | Typical | Up to |
|---|---|---|---|
| Belfast | £480 | £1,100 | £4,300 |
| Birmingham | £500 | £1,200 | £4,500 |
| Bristol | £530 | £1,300 | £4,700 |
| Cardiff | £490 | £1,200 | £4,400 |
| Edinburgh | £490 | £1,200 | £4,400 |
| Glasgow | £490 | £1,200 | £4,400 |
| Leeds | £490 | £1,200 | £4,400 |
| Liverpool | £490 | £1,200 | £4,400 |
| London | £600 | £1,400 | £5,400 |
| Manchester | £490 | £1,200 | £4,400 |
| Newcastle | £490 | £1,200 | £4,400 |
| Sheffield | £490 | £1,200 | £4,400 |
City guide estimates, scaled by local labour costs. Indicative averages for concrete base, not quotes.
Most of the regional gap is labour.
Common questions
How much does a concrete shed base cost?
On firms' own published prices, a 6 by 4 ft base costs from about £350 to £590, and an 8 by 6 ft base, the most common shed size, from about £500 to £900. One firm charges £1,350 for 8 by 6 ft. A 10 by 8 ft base is about £800 to £1,450. Those prices are for the firm to dig out, lay a sub-base and pour the concrete. At least one garden building seller does not dig out at all: it lays the concrete on ground you have cleared and levelled, so check what each price includes.
How much does a concrete base for a garage cost?
A single garage base of about 15 to 20 square metres costs about £1,500 to £2,600 on firms' published prices: one firm's reinforced 12 by 10 ft garage base starts at £1,395, and 20 by 10 ft bases run from £1,995 to £2,580. A double garage base is about £2,500 to £4,500: one installer lists £2,325 for 6m by 6m, and another firm's price for 20 by 20 ft is £4,392. A difficult site costs far more. One garage maker publishes a real quote from its contractor of £11,134 including VAT for a 34 square metre base that needed heavy digging and 15 cubic metres of soil taken away.
How much is a concrete base per square metre?
Firms that price by area charge about £100 to £160 per square metre on a straightforward site: £105 per square metre plus VAT from one firm, £9 to £15 per square foot (about £97 to £161 per square metre) from another, with digging out and waste removal priced on top by the second. Small bases cost far more per square metre. One firm's own prices work out at about £168 per square metre for an 8 by 6 ft base and about £105 for a 16 by 10 ft one. Some firms have a minimum charge, such as £750, or £1,200 for any base smaller than 14 by 8 ft.
Why do quotes for the same size of base differ so much?
Because the firms are not pricing the same base. Published specifications run from 75mm of concrete to bases about 150mm deep, some include steel mesh and a damp-proof membrane while others charge extra for them (one firm adds a membrane from £80), and some include digging out and taking the soil away while others leave that to you. Access matters too: where a lorry cannot reach, the concrete is barrowed in or pumped, and concrete suppliers charge about £275 to £300 for a pump. Compare quotes on thickness, sub-base, membrane, reinforcement and waste removal, not only on the price.
Is a paving slab, timber or ground screw base cheaper than concrete?
For a small shed, often yes. For a base of around 8 by 6 ft, firms' published prices are about £420 to £620 for a paving slab base, £370 to £840 for a timber frame base, and £500 to £900 for concrete. Ground screws cost more at that size: £1,180 for the screws alone and £1,650 with a timber frame fitted at one firm, and another charges a £1,800 plus VAT day rate. A garage, a garden room or anything heavy needs a concrete base.
How much does a concrete hot tub base cost?
One firm's concrete hot tub bases start from £795 for an 8 by 6 ft pad, with steel reinforcement extra on most, and another firm starts at about £2,000 for a reinforced base built to the hot tub supplier's requirements. A slab for a swim spa costs about £4,000 to £6,500 at that second firm. Check the hot tub maker's base requirements before booking, as the firm will build to them.
How much does it cost to remove an old concrete base?
Breaking up and taking away a small shed base starts from about £60 as an add-on to shed removal at one firm, and another adds £150 to £350. A medium slab of 5 to 15 square metres costs about £300 to £700 to break out and dispose of. Thicker or reinforced concrete costs more to break up.
Do I need planning permission for a concrete base?
In England, usually not. Laying a hard surface within the garden of a house for its own use is permitted development under Class F of the General Permitted Development Order. The exception is the front garden: if the surface lies between the front wall of the house and the road and covers more than 5 square metres, it must be porous or drain to a lawn or border, or it needs planning permission. GOV.UK's guidance says plain impermeable concrete with nothing to make it drain needs an application. Flats do not have these rights, and a council can remove them with an Article 4 direction, so check with the council if either applies. The building that sits on the base has its own planning rules.
Does a concrete base need building regulations approval?
Not for a typical shed, greenhouse or small garage. Schedule 2 of the Building Regulations 2010 exempts a detached single storey building of no more than 30 square metres with no sleeping accommodation, as long as it is at least one metre from the boundary or built substantially of non-combustible material. A bigger garden building, or a garden room someone will sleep in, needs approval for the whole building, so speak to building control before the base goes in. Scotland and Northern Ireland have their own building regulations.
Can I lay a concrete base myself?
Many people lay a small shed base themselves, as it needs no licence or approval. The work is digging out, compacting a hardcore sub-base, setting formwork level and pouring and finishing the concrete, and on a bigger base the concrete has to be placed before it starts to set. The concrete calculator works out how much concrete a base needs. A firm's price buys the labour, the waste removal and a level finish, which matters most under a garage or garden room.
Official guidance and sources
The rules and schemes referenced on this page come from these official UK sources. The price figures are Costwise's own; see how we price.
- General Permitted Development Order 2015, Schedule 2, Part 1, Class F legislation.gov.uk · A hard surface within the garden of a house is permitted development; in front of the house and over 5 square metres it must be porous or drain to a permeable area.
- Permeable surfacing of front gardens: guidance GOV.UK · Impermeable concrete over 5 square metres in a front garden, with nothing to make it drain, needs planning permission.
- Paving your front garden: planning permission Planning Portal · No permission is needed where the rainwater is directed to a lawn or border to drain naturally.
- Building Regulations 2010, Schedule 2 (exempt buildings) legislation.gov.uk · Class 6 exempts a detached single storey building of no more than 30 m² with no sleeping accommodation that is at least one metre from the boundary or built substantially of non-combustible material.
Cite this data
These figures are free to use in articles, reports and research under a CC BY 4.0 licence. All we ask is a credit to Costwise, and online a link. Where your style allows, please make "Costwise" the linked word so readers can check the figure for their own region.
Costwise (2026): A concrete base typically costs £1,200 in the UK, ranging from £500 to £4,500, including VAT where charged. Reviewed November 2026. costwiseuk.co.ukSource: Costwise (costwiseuk.co.uk)Costwise (2026). Concrete base cost. Costwise UK cost data, version 2026-11-27. https://costwiseuk.co.uk/concrete-base-cost/2026-11-27 (160 jobs)Dataset DOI: 10.5281/zenodo.21159943 · also on Kaggle, Hugging Face and Figshare. Method: how we price. Downloadable CSV.
These are independent guide prices based on typical UK jobs in 2026. Your actual cost depends on your property, spec, access and where you live. Always get at least three written quotes before committing.